Project Summary:

 

Due to increased flow and loading, the Town upgraded its treatment facility in 1997. The

upgrade required an expansion of the sludge dewatering operations. The existing belt

dewatering press had been operating reliably and efficiently since 1993. The 1997 upgrade included a new Gravity Belt Thickener (GBT) followed by the original, relocated belt dewatering press.

 

Use of the GBT decreases the volume of sludge applied to the belt press. In addition, overall

manpower and maintenance requirements are reduced with this arrangement. The thickened

sludge also results in a drier dewatered cake. The dried sludge in then processed on-site,

using static pile composting.

 

Our special thanks to Bill Cowles, Chief Operator. Bill's thorough understanding of the
dewatering equipment is what makes the equipment perform so well at his facility.

 

Plant Data:

 

Average Design Flow: 0.88 MGD Annual Sludge Production:     215 dry tons

Waste Activated Sludge (WAS) from Activated Sludge Secondary Treatment Process

 

Sludge Dewatering Equipment Components

 


Gravity Belt Thickener (GBT)

¨      One Meter GBT, 16' long deck

¨      Throughput: 50 to 200 gpm

¨      Feed Solids: 0.75%, thickened to 5%

Belt Dewatering Press

¨      Model EM: One Meter, 2-Belt Machine

¨      24 gpm of WAS dewaters to 15% solids

¨      Solids capacity: 600 dry pounds per hour